WebVertical Turbine Pumps Excludes motors, engines, gear drives, VFDs, and controls. For Pattersons packaged pump systems product, refer to the General Pump Inspection and Maintenance Schedule for packaged pump systems. Any additional inspections, maintenance, or tests required by NFPA- Standards for fire pumps are excluded. WebPreventative Maintenance Checklist for Booster Pumps: Record pump discharge and shutoff system pressure: Inspect mechanical seal for leakage: Hour meter reading: Clean strainers, PRV’s and CRD’s: Make sure gauges and switches are sensing pressure and the line is not obstructed: Inspect and clean check valves: Clean external motor surfaces
INSPECTION AND TESTING FORM - NFPA
WebVerify proper operation of oil drip lubricator (vertical wet pit pumps so equipped) Verify proper operation of automatic grease lubricator (vertical wet pit pumps so equipped) … Web2. Completely pump down the wet well to its lowest point and make a visual inspection. 3. Hose the wet well down during the pump down process. 4. Inspect wet well for excessive grease build up on surface, clean when needed. 5. Check wet well floats for rag build up, clean as needed. 6. Pumps and piping are checked visually for defects. 7. chinooks definition
Commissioning Checklist of Water Booster Pumps - MS-MEP
WebCheck for air, water, and oil leakages. Check the air intake chamber. Check all the various filters and filter elements. Check and adjust the various valves and switches. Check bolt and coupling connections as well as rubber inserts. Check the condition of all the fans, air paths, motors, and drive gears. Clean cooling system and check if it ... WebOct 23, 2024 · Booster Pump Maintenance Checklist. Before carrying out any pump maintenance or visual checks, you should ensure you have consulted the pump manufacture’s supply manual and have the right protective equipment. You should aim to carry out the following checks on a monthly basis: Visual inspection of the shaft seal for … WebCheck all terminations are completed and tightened as required. Check the grounding connections are completed and tightened as required. Ensure the overload protections are set correctly as per the pump motor load … chinook scotiabank theatre